Haven’s Double Bundle Loading System

Automotive Aftermarket Exhaust Manufacturer Challenge: Lean manufacturing principles have long been used to reduce the amount of non-value added or waste in manufacturing. One of those wastes is material handling. Simply moving a part from one location to another...

Integrated Double End Finishing & Length Inspection

Application: Driven to achieve zero defects, international automotive tube supplier performs 100% length inspection immediately after double end finishing. Solution: In the world of zero defect requirements, visual inspection is not adequate. After all, even 100%...